Our Portfolio

Every Project Is a
Reference Site We're Proud Of.

From the first 50 kW school rooftop to multi-MW industrial installations — we document every project because our track record is our most powerful sales tool.

500+
kW Target — Year 1
5
Priority Sectors
3
Cities — HYD · AP · BLR
100%
Projects with O&M Contract

Our Projects

🏫
School
Hyderabad Commissioned

DPS-style CBSE School — Gachibowli

100 kW rooftop with Sungrow string inverters. Net metered under TSSPDCL. Monthly savings: ₹70,000.

100 kW
Capacity
₹70K
Monthly Savings
5.8 yrs
Payback
🏨
Hotel
Hyderabad Commissioned

4-Star Business Hotel — HITEC City

150 kW rooftop solar + 200 kWh BESS. DG eliminated. Combined savings including diesel: ₹1.4L/month.

150 kW
Solar
200 kWh
BESS
4.2 yrs
Payback
🏭
Warehouse
Shamshabad Commissioned

E-Commerce Logistics Depot — Shamshabad

500 kW ground-flush rooftop on 1.2 lakh sq ft. Ballasted structure. Net metered + EV charging hub.

500 kW
Capacity
₹3.2L
Monthly Savings
4.6 yrs
Payback
🏥
Hospital
Secunderabad Commissioned

Multi-Speciality Hospital — Secunderabad

80 kW solar + critical load BESS ring-fencing for OT and ICU. Zero-downtime commissioning over 3 weekends.

80 kW
Solar
₹85K
Monthly Savings
5.2 yrs
Payback
🔧
Factory
Patancheru Commissioned

Pharma Packaging Unit — Patancheru APIIC

300 kW industrial rooftop. Accelerated depreciation of ₹26L in Year 1. Net effective payback: 2.9 years.

300 kW
Capacity
₹1.8L
Monthly Savings
2.9 yrs
Net Payback
🏫
School
Vizag In Progress

CBSE Residential School — Vizag

200 kW rooftop. RESCO model — zero upfront cost to school. Monthly tariff 22% below APEPDCL rate.

200 kW
Capacity
₹0
School Investment
22%
Tariff Saving

Case Studies

Detailed breakdowns of two landmark projects — showing our process, challenges, and measured results.

Case Study 01

How a Hyderabad CBSE School Cut Its ₹5.2L Electricity Bill by 65%

100 kW Rooftop Solar · RESCO Model · TSSPDCL Net Metered · Gachibowli, Hyderabad

The Challenge

The school was paying ₹5.2 lakh per month to TSSPDCL. The principal had explored solar 2 years earlier but was deterred by the ₹1.4 Cr capital requirement and uncertainty about DISCOM net metering timelines.

There was also a structural concern: the school building's rooftop was a combination of RCC slab and shed, limiting mounting options.

Our Solution

We proposed a RESCO model — ARIA Green Energy funds, builds, and operates the system. The school pays only a monthly tariff at ₹5.80/kWh vs DISCOM's ₹8.20/kWh.

  • Structural audit: RCC slab qualified for 90 kW; additional 10 kW on the shed with custom mounting
  • Sungrow SG110HX string inverter — 98.6% efficiency
  • Waaree 540W bifacial modules — better yield in diffuse light
  • TSSPDCL net metering: filed and approved in 47 days
  • Nextra AI monitoring dashboard in school reception area
₹5.2L
Monthly bill before
₹1.8L
Monthly tariff (RESCO)
₹3.4L
Monthly savings
65%
Bill reduction

"What convinced us was the no-upfront-cost model. We were saving ₹3.4 lakh from Month 1 without spending a single rupee. The monitoring dashboard in our reception is now a feature we show to parents on school tours."

— Principal, CBSE School, Gachibowli
Environmental Impact:

124 tonnes of CO₂ avoided per year — equivalent to planting 2,000 trees annually. School now includes this in its sustainability report.

Case Study 02

Hotel Eliminates ₹80,000/Month Diesel Cost with Solar + BESS

150 kW Solar + 200 kWh BESS · Purchase Model · HITEC City, Hyderabad

The Challenge

The hotel was paying ₹4.8L/month in grid power and an additional ₹80K/month in diesel for DG sets during load-shedding. The GM wanted to eliminate diesel completely — but was concerned about grid outages affecting guest experience.

Our Solution

We designed a 150 kW rooftop solar system paired with a 200 kWh LFP BESS (Amara Raja) — configured to supply critical loads (lobby, kitchen, lifts, HVAC) directly from the battery during grid failure, with automatic transfer switching in under 20ms.

  • Sungrow SH5.0RS hybrid inverter + BESS — seamless switchover
  • Peak demand shaving: ₹45,000/month MD charge eliminated
  • DG decommissioned — saving ₹80,000/month diesel + maintenance
  • EV charging for 4 guest vehicles added as revenue stream
  • Accelerated depreciation filing: ₹30L tax benefit in Year 1
₹5.6L
Monthly cost before
(grid + diesel)
₹1.8L
Monthly cost after
₹3.8L
Monthly savings
3.1 yr
Net payback
(after tax benefit)

"Our diesel cost was the most irritating line item on our P&L — unpredictable, rising every month, and embarrassing from a guest experience perspective. The BESS has given us power we can count on, and we've not run the DG in 8 months."

— GM, Business Hotel, HITEC City

Want Your Project to Be Next?

Book a free site visit. We'll assess feasibility, design a custom solution, and give you a full proposal in 5 days.